Differences

This shows you the differences between two versions of the page.

fullcost-additional-work [2012/01/26 20:28]
simon [WG2: Security]
fullcost-additional-work [2012/01/26 20:40] (current)
simon [WG4: Tools & Applications]
Line 80: Line 80:
 == Year 1 == == Year 1 ==
  
-During the first year of the Action, WG4 will prepare a report on potential case studies that can be undertaken in collaboration with the industrial participants. This will begin with an assessment of real software systems and the problems that companies face in developing them, and then identify a range of systems or sub-systems that exemplify particular issues. This report will be used to plan application-focused work during the remainder of the Action. +During the first year of the Action, WG4 will prepare a report on potential case studies that can be undertaken in collaboration with the industrial participants. This will begin with an assessment of real software systems and the problems that companies face in developing them, and then identify a range of systems or sub-systems that exemplify particular issues. If possible this will include case studies related to systems with a high social impact, such as integrated European health services or voter management systems for electronic elections. The report will be used to plan application-focused work during the remainder of the Action. 
  
 == Year 2 == == Year 2 ==
 
fullcost-additional-work.txt · Last modified: 2012/01/26 20:40 by simon
 
Except where otherwise noted, content on this wiki is licensed under the following license:CC Attribution-Share Alike 3.0 Unported
Recent changes RSS feed Donate Powered by PHP Valid XHTML 1.0 Valid CSS Driven by DokuWiki